
Upgrading our Caves Road pipeline
Posted: 9 January 2025
The Caves Road pipeline upgrade project will involve the design and construction of a 560mm outer diameter Polyethylene additional water supply main which will run 1.2km along Caves Road from Lennox Drain to Marybrook Drain. Read more